Monday 27 October 2014

Russia Assembling and Localization

Russia Assembling and Localization
We are planning to start local work in Russia for our pipe equipment as follows:

 1) Paint
 2) Coating
 3) Shot blasting
 4) Circum welding for final size
 5) Attachment item
 6) Local installation
 7) Construction work
 8) Final assembly

Regarding localization for linepipe production procedure, finalization works may be done in Russia, with local company and offer technical and consulting work training and transfer.
We can upgrade technical part and may consider joint works.

In Korea 12 meter is produced.  For Russian clients may require 65 meter, therefore works of welding and coating and above may be done  in Russia.

No comments :

Post a Comment